Demolition of Tumbler Ridge Secondary School in northeastern British Columbia commenced on Monday, several months following a tragic mass shooting incident.
On February 10, the school witnessed the loss of five children and one educational assistant in one of the most devastating mass shootings in Canada’s history.
In preparation for its demolition, crews have been diligently clearing out the school’s belongings using covered trucks over the past few weeks.

A memorial honoring the victims of the mass shooting at Tumbler Ridge Secondary School. (Matt Preprost/CBC)
In a letter addressed to residents, School District 59 superintendent Christy Fennell stated, “This marks a significant step in the meticulous, phased removal of the current school building, which is anticipated to take a few more weeks.”
“Once the structure has been dismantled, efforts will continue throughout the fall to restore the area to grass,” she added.

Heavy machinery is depicted in the process of demolishing the school building. Crews have been clearing its contents in preparation for the demolition. (CBC News)
The school district has indicated that the demolition will occur in stages to reduce disturbances.
All demolition debris will be transported to regional landfills rather than being kept within the community to safeguard privacy, according to officials.
In May, Premier David Eby revealed intentions to quickly replace the school at a new, yet-to-be-disclosed location.
The federal and provincial governments have pledged a total of $200 million for the construction of the new school and enhancements to the local health center.
The community of Tumbler Ridge has approximately 2,400 residents, with around 160 students in grades 7 to 12 enrolled at the secondary school, which also featured a college campus.

One of several modular classroom pods established for Tumbler Ridge secondary students while plans for a new school are underway. (Matt Preprost/CBC)
Following the shooting, temporary portable classrooms have been set up on the grounds of the local elementary school.
Additional modular facilities — including restrooms, offices, counseling areas, and a communal space — are expected to be introduced for the 2026-27 academic year.
The school district plans to engage with students and community members regarding the conceptual designs for a new secondary school this fall.
Subscribe to CBC’s Fort St. John Weekly for a summary of the most significant news and stories from B.C.’s Peace and Northern Rockies.


