The government of Alberta is set to unveil a new royalty program designed to reduce the financial burden on capital investments required for initiating new projects and expanding existing ones in the oilsands sector.
Under the Oil Sands Growth Program (OGP), projects that receive approval will benefit from a lowered royalty rate of two percent for the initial five years of production. Following this period, the rate will increase by one percentage point each year, reaching six percent by the ninth and tenth years.
Premier Danielle Smith anticipates that this initiative will attract investors, particularly as Alberta strives to achieve a target of 8 million barrels of oil production per day by 2035. Smith highlighted that the province is currently producing approximately 5 million barrels.
“To achieve our objective of doubling oilsands output over the next decade, we require hundreds of billions of dollars in fresh investment, and we must accomplish this while competing against the United States and Venezuela,” Smith stated during a news conference in Calgary where the new program was announced.
“The competition for global investment is significant. Major energy projects necessitate billions in capital and extensive planning.”
According to Smith, the OGP will reduce the initial financial hurdles associated with new projects and expansions, especially as advocates for the Pacific Link pipeline seek companies to occupy upcoming capacity.

Alberta Premier Danielle Smith, flanked by Pembina Pipeline CEO Scott Burrows and Prime Minister Mark Carney, at a press conference north of Fort McMurray, Alta. on Oct. 1, 2026 to announce the declaration of the Pacific Link pipeline as a project in the national interest. (Vincent McDermott/CBC)
Smith clarified that the OGP will not replace the current royalty structure or guarantee project approvals, and emphasized that it will also not bypass environmental or Indigenous consultation protocols.
The eligibility criteria will not be restricted to the five members of the Oil Sands Alliance, which includes the nation’s largest oilsands companies. Project approvals will be assessed individually and may encompass expansions.
After ten years, companies will revert to the standard royalty framework, or if they fail to meet production, environmental, or regulatory standards.

Steam-assisted gravity drainage (SAGD) pads at Cenovus Energy’s Christina Lake oilsands facility, located southeast of Fort McMurray, Alta., on Wednesday, April 24, 2024. Company representatives say this pad, using the most current technology, requires less energy per wellhead to harvest bitumen than earlier versions. (Amber Bracken/The Canadian Press)
The Alberta government intends to roll out the OGP in the spring, but projects announced after November 15 will still qualify. Smith mentioned that the province will evaluate the program’s performance three years from now, specifically in December 2029.
In contrast to the current royalty scheme, the OGP will not link rates to West Texas Intermediate oil prices. Alberta Energy Minister Brian Jean noted that if the standard provincial royalty rate is lower than the incentive rate, companies will pay the lesser amount.
“Oilsands projects represent some of the largest and most capital-intensive energy investments globally. Companies require a highly competitive investment atmosphere and assurance in that fiscal framework,” Jean stated.
Smith highlighted multiple regulatory rollbacks as successes for the oilsands, including the federal government’s decision to eliminate its oil-and-gas emissions cap and net-zero power regulations. She commended the advancements made regarding the Pacific Link pipeline and noted that recent surveys indicate strong support among Canadians and Indigenous peoples for the development of the nation’s oil and gas industry.
Kendall Dilling, president and CEO of the Oil Sands Alliance, acknowledged that there is still much work to be done for the sector to achieve its full capabilities, including the need to update and refine regulatory frameworks. However, he noted that both governments and the industry have been addressing these challenges, leading to improved investment conditions over the past year.
“Today, I feel more optimistic than ever,” Dilling expressed during the news conference on Friday.
-
Analysis
Danielle Smith wants to double Alberta oil production. Can she bring back the boom?
-
Ottawa wants to expand the oilsands, but the industry’s wastewater problem will grow with it
Janetta McKenzie, director of oil and gas at the Pembina Institute, a clean-energy think tank, is skeptical about the necessity of the OGP in driving investment. “Especially considering the taxpayer-funded pipeline and several recent tax breaks announced by the federal government,” she remarked to CBC News.
“The oilsands industry is highly profitable and has been for quite some time. It is a well-established sector… this is not an area that has faced revenue struggles in recent years.”
She expressed concerns that Alberta might forfeit oil revenue by removing price adjustments, as oil companies are currently enjoying substantial profits. McKenzie also questioned the potential environmental impact of increased production.

